My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE50765
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE50765
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:55:09 PM
Creation date
11/20/2007 2:37:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994093
IBM Index Class Name
Permit File
Doc Date
3/23/1995
Doc Name
DAHLIA NORTH RES PIT FN M-94-093
From
ADCO CONSULTING
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
... <br />EXHIBIT E - RECLAMATION PLAN NARRATIVE (CONTINUED) <br />(Revised 03/21/95) <br />Compaction will be achieved by driving trucks and other <br />equipment over filled areas, and by the use of equipment on <br />the bank areas, prior to placement of topsoil for revegetation <br />(if any bank areas remain as part of permanent reclamation). <br />If lake banks are part of permanent reclamation, maintenance <br />of Che banks will be required as part of ongoing maintenance <br />with reconstruction of banks being undertaken, or placement of <br />riprap in some areas, as needed. <br />4. Abutting the west and north sides of the property will be the <br />South Platte River channel area. This area will serve a dual <br />purpose of flood control and wildlife habitat. Ground cover <br />vegetation will be established in the northwest corner of the <br />property, north and west of the riprap trench and the slurry <br />wall. The ground cover will be established by placement of 6" <br />of topsoil borrowed from an approved mining area and seeding <br />in accordance with the approved plan. If existing sands and <br />gravels are to be removed prior to topsoil placement in order <br />to comply with regulations regarding fill placement in a <br />floodway, then care will be exercised to avoid damaging root <br />systems of the trees in the area. No topsoil will be placed, <br />or surface material removed, in the drip zones of existing <br />trees within the area north of the rip-rap trench and slurry <br />wall area. Anv areas disturbed b~installation of any channel <br />improvements will also be revegetated per the reseeding <br />requirements on the next page. <br />5. The reclamation recommendations included in Exhibits I and J, <br />on subsoiling, mulching, fertilization, weed control, and <br />grazing will be followed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.