Laserfiche WebLink
RECLAMATION LOST SUMMARY cont~d sheet 3 of 4 <br />N. EARTHWORK -STREAM CHANNEL RECONSTRUCTION <br />Task No.~ Task Description ~ Cost (S) <br />__...____I..___._..___._.,_________________.,_..__.._____________I_________~__ <br />Subtotal (H): <br />__ _____ ___ <br />1. EARTHWORK -DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task No.~ Task Description ~ Cost (f) <br />______ _I.,_________________...____.,____.,.__~..._____..__.__ _I____.____.__ <br />'~ <br />Subtotal (1): <br />J. EARTHWORK - TOPSOIL/SUBSOIL REPLACEMENT <br />iesk No.~ Task Description ~ Cost (f) <br />3 ~ Replace Topsoil in Phased Area ~ f8,493 <br />Subtotal (J): (8,493 <br />