Laserfiche WebLink
Mr. John Walters - page 6 <br />• At this stage of the project we would recommend the <br />continuation of the performed monitoring of water use and <br />discharge from the mine. In addition to the discharge monitoring <br />it would be advisable to collect a water sample from the mine <br />face sump twice annually and to perform a more complete analysis. <br />A list of parameters for the laboratory analysis of water should <br />be discussed with the Colorado MLRD. <br />When the mine expands further toward the northeast, and if <br />the water inflow substantially increases, it would be advisable <br />to establish a more complete monitoring system. The type of <br />future monitoring should be discussed with the Colorado MLRD. In <br />the discussion with MLRD the following factors should be <br />stressed: <br />o Insignificant quantity of water flowing into <br />the mine; <br />o Good water quality of the water discharged <br />from the mine; <br />o Absence of adjudicated surface and ground <br />water rights which could be impacted by the <br />mining activities. <br />• <br />• r • <br />We hope that this evaluation will satisfy the requirements <br />of the Colorado MLRD. If you need some more information in this <br />matter please do not hesitate to contact us. <br />Very Truly Yours, <br />• Encl. <br />HYDRO-GEO CONSULTANTS <br />~ad~~ ° <br />Vladimir Straskraba <br />Principal Hydrologist <br />,~ , <br />