Laserfiche WebLink
<br /> <br />SURFACE WATER Apr-98 Ma -98 Jun-98 <br />AG-1 "A" Gulch 20-Apr-98 28-Ma -98 26-Jun-98 <br /> <br />FIELD MEASUREMENTS <br />Flow GPM 0 0 0 <br />H standard <br />Conductivity umhos/cm <br />Tem erature Celsius <br /> I I <br /> I <br /> I <br />SURFACE WATER A r-98 May-98 Jun-98 <br />BG-1 "B" Gulch 20-Apr-98 28-Ma -98 26-Jun-98 <br /> I <br />FIELD MEASUREMENTS <br />Flow GPM 0 0 0 <br />H standard <br />Conductivity unil~os/cm <br />Tem erature Celsius <br /> I I <br />SURFACE WATER Apr-98 May-98 Jun-98 <br />CG-I "C" Gulch 20-A r-98 28-Ma -98 26-Jun-98 <br /> I I <br />FIELD MEASUREMENTS <br />Flow GPM O 0 0 <br />H standard <br />Conductivi umhos/cm <br />Tem erasure Celsius <br /> I <br />SURFACE WATER LAB RESULTS <br />Note 5 <br />