Laserfiche WebLink
July 9, 1981 <br />Page -?- <br />Reclamation Cost <br />(I) The staff feels that your submitted reclamation costa are e:tremeIy low <br />and are inadequate to cover the ~penas of reclaiming this Bite. The <br />staff has estimated that it would coat the State between approximately <br />513,500 and S?O,000to reclaim this site on a worst case basis. The ooata <br />are broken down as followaf <br />Seeds @ 53/lb. 6 171bs./acre ~ S81 <br />Seeding (broadcast) ~ S50 <br />Fertilizer 401bs./acre ~ S30 <br />Shallow diacing 1.6 hr/acre <br />@ S?5/hr ~ $40 <br />S?O1 per acre <br />Replace f~000 yd3 topsoil @ <br />.60C/yd ~ 59000 <br />1bta1 reclamation cost <br />S9000 + ??(S?00/ac.) ~ Sj3,400 <br />to 59000 + 56 (5100/ec.) ~ S?0,?00 <br />Per your request the Board will continue their consideration of your <br />application until the August ?6-?7 1981 Board meeting. <br />As always, if you have any questions/comments do not hesitate to contact me. <br />sincerely, <br />bay Lucas <br />Reclamation Specialist <br />Jllssa <br />