Laserfiche WebLink
<br /> <br />COAL COMPANY QUARTERLY POND INSPECTION REPORT <br />Inspector Name: ~.4RR~ Qesr~ke Date: Q•22.94 <br />Pond Number: 2 Date Last Inspection: /•i9.9 4 <br />Site Name: f.rL - SoN.y/~ Quarter: ,r'craror 94 <br />1. Design Depth Measured From Spillway Invert 0.3/ <br />2. Design Maximum Sediment Level Measured From Spillway Invert 0.2 7 <br />3. Sediment Level/Pond Bottom Measured From Spillway Invert ~,2 <br />4. Water Level Measured From Spillway Invert ~ g,2 <br />5. Discharge Through Spillway Since Last Inspection Yes _~ No <br />6. Ri 11 s and Gullies Yes ~' No <br />7. Vegetation Adequate rr Yes No <br />8. Outlet Channel Erosion Yes ~ No <br />9. Animal Burrows . <br />10. Cracks . <br />11. Seepage <br />12. Spillway Clogged . <br />13. Valves Operational . <br />ADDITIONAL COMMENTS: <br />Yes X No <br />. Yes k No <br />. Yes Y No <br />Yes _ ?~ No <br />. . /.1/R Yes No <br />MAINTENANCE REQUIRED: ,uv~v <br />- - 4- ~ - <br />,vL 0 ~ G <br />3 ~ q° <br /> SPILLWAY SNV~ <br />- ~--- <br />~ ~ 2 ~ ti <br /> ~ ., p <br />W W ~ W W <br />~ <br />`O hv A ~~ <br />