Laserfiche WebLink
SEDCAD+ BASIN CAPACITY UTILITY <br />pondl+2 <br />ELEVATION STAGE AREA CAPACITY <br />(ft) (ac) {ac-ft) <br />_S 3 =C 1 <br />50.00 0.00 0.23 0.00 <br />50.20 0.20 0.29 0.05 <br />50.40 0.40 0.35 0.12 <br />50.60 0.60 0.42 0.19 <br />50.80 0.80 0.50 0.29 <br /> <br />51.00 <br />1.00 <br />0.58 <br />0.39 1.15 A.F, excess <br />51.20 1.20 0.67 0.52 capacity <br />51.40 1.40 0.76 0.66 <br />51.60 1.60 0.85 0.82 <br />5 .80 1.80 0.97 1.00 <br />52.00 2.00 1.08 1.21 Design sediment - <br />52.20 2.20 1.20 1.44 <br />52.40 2.40 1.34 1.69 Max. Sediment Level 752. <br />52.60 2.60 1.48 1.97 <br />52.80 2.80 1.62 2.28 <br />53.00 3.00 1.78 2.62 Design runoff - 1.99 A.F <br />53.20 3.20 1.94 2.99 <br />53.40 3.40 2.11 3.40 <br />53.60 3.60 2.28 3.84 Emergency spillway <br />53.80 3.80 2.47 4.31 <br />54.00 4.00 2.65 4.$2 <br />~~ <br />Design for combined sediment control in Ponds 1 and 2 to contain <br />a 25 year 24 hour storm event. Calculations based upons design <br />assumptions in Appendix X, volume 3. <br />Pond 1 - Area = 24.5 acres, CN 85 (App. X) <br />25 year storm event runoff = 0.65 inches (App. X) <br />Runoff for a 25 year event 0.65 x 24.5 / 12 = 1.33 A-F <br />Sediment storage = 0.36 A-F (App. X) <br />Pond 2 - Area = 18.0 acres, CN 80 (App.X) <br />25 year storm event runoff = 0.44 inches (App. X) <br />Runoff for a 25 year event = 0.44 x 18.9 / 12 = 0.66 A-F <br />Sediment storage = 0.10 A-F (App. X) <br />Combined Capacity Requirements <br />Runoff for a 25 year event = 1.33 + 0.66 = 1.99 A-F <br />Sediment Storage = 0.36 + 0.10 = .46 A-F <br />Total storage = 1.99 + 0.46 = 2.45 A-F <br />f • <br />UTL - 5 New 12/16/94 <br />