Laserfiche WebLink
ANNUAL SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rule 4.05.3(15) <br />Mine: New Elk <br />NPDES ID. No.: Pond #8 <br />Inspection Period: Fourth Quarter 2005 <br />Inspection Date: 12/282005 <br />General Description or Reference to S'rte Plan: <br />This pond receives run-oif from the Refuse Disposal Area. The embankment height is 28.0' at an <br />elevation of 7459.0'. The Primary Riser is at 7451.75'. <br />1). Adequacy of the vegetative cover. <br />2). Erosion forming Gullies: <br />3). Is wave action causing erosion: <br />On the Upstream embankment? <br />At the principal spilMray inlet? <br />Yes <br />Yes <br />4). Erosion of the downstream tce of the embankment? Yes <br />Cause of erosion can be attributed to: <br />No ~/ <br />No !/ <br />No [._ <br />5). Is seepage occurring through the dam? Yes <br />Could this seepage cause potential instabililyt <br />No ~i- <br />PRINCIPAL SPILLWAY <br />1). Is the princpal spilMray system in working ordert <br />2). Is the inlet free of debris and restrictive material? <br />3). Is the discharge outlet free of restrictive material? <br />4). Is erosion occurring at the discharge outlet? <br />Evaluate the severity: Extensive Moderate <br />Excellent oderat Few Poor <br />Extensive Some ® None <br />Yes ti No <br />Yes v No <br />Yes~_ No <br />Yes No l./ <br />Just starting None <br />Page 1 <br />