Laserfiche WebLink
iiiiiiiiiiiiiiuiii <br />999 <br />E~~A <br />S Coal Company Seneca Coal Company <br />RECEIVED <br />MAR 13 2000 <br />Division of Minerals 8 Geology <br />March 7, 2000 <br />Ms. Sandra Brown <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203-2273 <br />RE: Quarterly Sedimentation Poad Inspections - Seneca II-W Mine <br />Dear Ms. Brown: <br />Enclosed is the fourth quarter inspection reports for Ponds 005, <br />006, 009, and 015 at the Seneca II-W Mine. The as-built report <br />for pond 015 is currently being prepared and will be forwarded <br />shortly to the Division for inclusion in the permit package. <br />Conditions appeared stable and acceptable. <br />If you have any questions, please call me.~%. ,;, ;?~C~?`~. <br />S <br />Michae$"~~••~k~~~~a, P.E. <br />Enginee r <br />Enclosure(s) <br />c: Dennis Jonea (SCC) <br />MAR 0 ? 2000 <br />Seneca Coal Company • P.O. Drawer D • Hayden, Colorado 61639 <br />Telephone (970) 276-3707 • FAX (970) 276-3014 <br />