Laserfiche WebLink
CC8V Go 1 d Mng . Co . _ ID•9-689-4040 JUN 1~5 20 ~ 26 No .012 P .05 <br />May 1A, 1995 -2- 943-2817 <br />The response levels or ALR's for•the Cresson Project have boen previously identified az follows: <br />Low Volume 5olutlon Calleetion l•'ill Plow Rnte <br />less than SO Dercrnt ezaerdaace <br />SO percent to 10 percent acceedance <br />Action <br />Pump collected leachau <br />Increase LVSCS measurement from wakty to daily <br />lntervalt and roptdr any observed liner detaege <br />10 ptmttt m 2 percent exaeedonee <br />above 2 ptmat exceedmce <br />UNER LF.AKAdE EVALliA710N <br />Advise DMO of the LVSCS pump rate and improve <br />wetar matragattreat to redone flowmm <br />Advise the DMG and reduce rise LVSC6 Ilowrata <br />through the following meeautc+: <br />• reduu htxd on liner; <br />• plot tt+te ofLVSCS flownu vaeut eoludoa <br />c4vatioa; <br />• none when LVSCS flowrare lbllt within <br />eacptable envelope; and <br />• maintalu solutioa levels within acceptable <br />limits durioR all periods of opatatioa <br />A probablllstic antlysis waz next performed using the Frtce1 add-0n program Crystal Ball. 'Ihe Qyswl Bell <br />propjam urea aimuJetlao w model the full rngge of possible values and measures tfre liloellhood of <br />navnimce for each possible value. Repaldve Moms Carlo sampling of the distribuliont for the heed and <br />defect ¢n;a war performed. It war aatumcd that tha dcfecl diamcta would follow a normal distribution. <br />The head war modeled u ^ trittaguLt tlistnbutioa for vari0ut dcplhs. 77tcrrbY, the disbtbtttioa for tha <br />defect arcs and haed was incatporatcd into Equation (1] to tlttumittc me probahliry distribution for lino <br />leakages Yen 2yl (!990) esrimated due ddcct siao may have a eecfficiatt of variotion of SO petcrnc <br />Defxts ware modeled with a normal distribution for an avenge dituncur of 2 mm and a sW lord dcvintion <br />of 1 tnm. One defter was assipted per sae of gwmembtane. In tha event of that a 8acdon of a defect <br />was cslculeted, the number of delbus west rounded W to the next inta;ea• vslpe. <br />The elevation veKUS geoembrrae tut2fte eves was provided by the Cripple Creel• & Vfcur Gold Mining <br />Company (CCdcV ), Thb fnformadon lc preseared in fable 1. <br />CONCLUSION <br />The results of this investigation vary from the origitrel analysis perfoted by polder (1994) for Ibt <br />followiag roosoaa: <br />• The gcomrarbreac audece arcs used In [hc wlculatloos reflects the octual surf¢cc aro¢ versus <br />elevation for the Phases i t'regnant Pond geomcnbrane after construction; <br />• Flow was calNlated based on cakulattaZ the head on a defect for discreot sections. The <br />Pregasnt Pmtd wns dlvtded faro 14 latervalt, each correspoadlnr roughly equal to l sae of <br />geomembaane Brea, The provloue aaalysu aced ao aveta."e head over dte eneiro Preonanr <br />Pond; and <br />• Flow was calculated based on ea Integu value of defects. <br />Golder Assoelntes fut. <br />