Laserfiche WebLink
<br /> <br />COAL COMPANY QUARTERLY POND INSPECTION REPORT <br />Inspector Name: LA/1Ry ~PJc~kP Date: 4-24- 9G <br />Pond Number: # 9 Date Last Inspection: /-/A-3c <br />Site Name: RIR~7A ~ Quarter: J~Pto,,,d /990 <br />1. Design Depth Measured From Spillway Invert 9.0 <br /> <br />2. Design Maximum Sediment Level Measured From Spillway Invert 4.7 <br /> <br />3. Sediment Level/Pond Bottom Measured From Spillway Invert 7, S' <br /> <br />4. Water Level Measured From Spillway Invert i/o.~~ <br /> <br />5. Discharge Through Spillway Since Last Inspection _ Yes _~ No <br />6. Rills and Gullies Yes a'' No <br />7. Vegetation Adequate X Yes _ No <br />8. Outlet Channel Erosion Yes k No <br />9. Animal Burrows Yes X No <br />10. Cracks i Yes ?r No <br />11. Seepage _ Yes )' No <br />12. Spillway Clogged _ Yes X No <br />13. Valves Operational J~ Yes _ No <br />ADDITIONAL COMMENTS: ,~,N, <br />MAINTENANCE REQUIRED <br />- - ¢ F - <br />W <br />f ~ O p <br />3 ~ 0.~ <br />SPI==WAY SNVe <br />--~--- - <br />2 ~ 2 ~ z <br />h O i n O W <br />r O h .~'i e o A ~`~l <br />