Laserfiche WebLink
Page 7 Colorado Department of Public Health and Environment <br />Construction Permit Air Pollution Control Division <br />COAL COMPANY <br />Permit No. 93R01204 <br />Initial Approval -Modification-5 <br />ATTACHMENT A [CONTINUATION - 3] <br />DETAILS OF EQUIPMENT / ACTIViTiES COVERED UNDER THIS FACILITY-WIDE PERMIT <br /> <br /> DESCRII'rION <br />AIRS MAKE, MODEL, SM. DESIGN RATE, CAPACrI'Y, DIMENSIONS. REMARKS <br />ID OPERATION RATE, CONSUMPTION, THROUGHPUT, PRODUCTION, SPECIFlC PROVISIONS <br /> EMISSION CONTROLS <br />116 SCREENING-1: <br /> ONE (1) MORGENSETJ, MODEL AND SM: NOT AVAILABLE. VBRATTNG <br /> SCREEN, MEASURING 7' WIDE X 7' LONG, DESIGN RATED AT <br /> 1,800 TONS PER HOUR. <br /> QUANTITY OF COAL SCREENED: 160,000 TONS PER YEAR. OVERALL CONTROL EFFICIENCY <br /> FOR TSP AND PM,° IS A MINIMUM <br /> EMISSIONS OF PARTICULATE MATTER CONTROLLED BY ONE (1) MAKE. OF 95.0 %. <br /> MODEL AND SM: NOT AVAILABLE, BAGHOUSE. <br />I l7 SECONDARY CRUSHER HOUSE TRANSFER POINTS• <br /> NUMBER OF TRANSFER POINTS - I. <br /> OVERALL CONTROL EFFICIENCY <br /> QUANTITY OF COAL PROCESSED: 10,000,000 TONS PER YEAR. FOR TSP AND PM,° IS A MMIMUM <br /> OF 95.0 %. <br /> EMISSIONS OF PARTICULATE MATTER CONTROLLED BY ONE (1) MAKE, <br /> MODEL AND SM: NOT AVAILABLE. BAGHOUSE. <br />118 SCREENING -111SECONDARY CRUSHERI: <br /> ONE (1) MAKE, MODEL AND SM: NOT AVAILABLE. VIBRATMG SCREEN, <br />~~ MEASURMG 10' WIDE X 20' LONG, DESIGN RATED AT 2,000 TONS <br /> PER HOUR. <br /> QUANTrIY OF COAL PROCESSED: 10,000,000 TONS PER YEAR. <br /> OVERALL CONTROL EFFICILT7CY <br /> EMISSIONS OF PARTICULATE MATTER CONTROLLED BY ONE (1) MAKE, FOR TSP AND PM„ IS A MINIMUM <br /> MODEL AND SM: NOT AVAILABLE, BAGHOUSE. OF 95.0 %. <br />121 STOKER COAL RAILCAR LOADOUT: <br /> ONE (1) LOADOUr (:HUTS. <br /> QUANTITY OF COAL LOADED: 50,000 TONS PER YEAR. OVERALL CONTROL EFFICIENCY <br /> FOR TSP AND PM,° IS A MINIMUM <br /> EMISSIONS OF PARTICULATE MATTER CONTROLLED BY ETICLOSMG OF 90.0 %. <br /> THE CHUTES <br />122 MAIN RAILCAR LOADOUT: <br /> ONE (1) LOADOUT CHUTE. <br /> QUANTnY OF COAL LOADED: !0,000,000 TONS PER YEAR. <br /> OVERALL CONTROL EFFICIENCY <br /> EMISSIONS OF PARTICULATE MATTER CONTROLLED BY ENCLOSING FOR TSP AND PM,° IS A MMIMUM <br /> THE CHUTES. OF 90.0%. <br />ATTACHMENT A CONTINUED ..... <br />• <br />107/0009/999 <br />