Laserfiche WebLink
<br />i <br />r~. <br />`~ <br /> <br />FUGITIVE DUST CONTROL PLAN <br />Permit 83D1299 <br />The following fugitive dust control measures shall be used for enforcement <br />purposes on the sources covered by this permit, as required by the~Air <br />Quality Control Commission Regulation No. 1. <br />1. Unpaved haul roads shall consist of gravel treated with magnesium <br />chloride. <br />2. Haul roads shall be watered at least 2 times per day unless adequate <br />natural moisture is present. <br />3. Haul traffic shall be kept at the minimum rate needed to transport <br />loads'. <br />4. Haste disposal area shall be constructed In such a manner as to reduce <br />exposed surface area. <br />5. All berms, subsoil piles, topsoil piles, ponds, and ditches will be <br />fertilized and seeded. <br />6. Straw mulching shall be used over the pond dam and access road cuts <br />and fills. <br />7. Haterials which compose waste disposal pile shall be compacted to <br />control emissions. <br />