Laserfiche WebLink
<br />BOWIE RESOURCES LIMITED <br />Permit No. 1 1 DL252-2 <br />Initial Approval <br />Page 3 <br />8. This source is subject to New Source Performance Standards requirements of Regulation No. 6, <br />Part A, Subpart Y, Standards of Performance for Coal Preparation Plants as follows: <br />a. Maximum 20% opacity from any coal storage, loading and transfer equipment. <br />b. EPA Method 9 shall be used to measure opacity. <br />In addition, the following requirements of Regulation No. 6, Part A, Subpart A, General Provisions, <br />apply. <br />a. No article, machine, equipment or process shall be used to conceal an emission <br />which would otherwise constitute a violation of an applicable standard. Such <br />concealment includes, but is not limited to, the use of gaseous diluents to achieve <br />compliance with an opacity standard or with a standard which is based on the <br />concentration of a pollutant in the gases discharged to the atmosphere. 14 60.12) <br />b. Written notification of construction and initial startup dates shall be submitted to <br />the Division as required under § 60.7. <br />• <br />c. Records of startups, shutdowns, and malfunctions shall be maintained, as required <br />under § 60.7. <br />d. Written notification of opacity observation or monitor demonstrations shall be <br />submitted to the Division as required under § 60.7. <br />e. Compliance with opacity standards shall be demonstrated according to § 60.11. <br />f. At all times, including periods of start-up, shutdown, and malfunction, the facility <br />and control equipment shall, to the extent practicable, be maintained and operated <br />in a manner consistent with good air pollution control practices for minimizing <br />emissions. Determination of whether or not acceptable operating and maintenance <br />procedures are being used will be based on information available to the Division, <br />which may include, but is not limited to, monitoring results, opacity observations, <br />review of operating and maintenance procedures, and inspection of the source. <br />(Reference: Regulation 6, Part A. General Provisions from 40CFR60.11) <br />A copy of the complete applicable subpart(s) is attached. <br />9. All previous versions of this permit are canceled upon issuance of this permit. <br />10. Prior to final approval being issued, the applicant shall submit to the Division for approval an <br />operating and maintenance plan for all control equipment and control practices, and a proposed <br />record keeping format that will outline how the applicant will maintain compliance on an ongoing <br />basis with the requirements of condition numbers 2, 3, 6, 7, and 8 listed above. (Reference: Reg. <br />3, Part B,IV.6.2) <br />r 1 <br />L~ <br />29/8/12 <br />