Laserfiche WebLink
1' <br />i• ~' <br />BOWIE RESOURCES LIMITED <br />Permit No. 12DL595 <br />Initial Approval <br />Page 2 <br />4. Emissions of air pollutants shall not exceed the following limitations las calculated in the Division's <br />preliminary analysisl. Compliance with the annual limits shall be determined on a rolling 1121 month <br />total. By the end of each month a new twelve month total is calculated based on the previous <br />twelve months' data. The permit holder shall calculate monthly emissions and keep a compliance <br />record on site for Division review. (Reference: Regulation 3, Part B, III.A.4) <br />Particulate Matter : ............ 434.7.1 pounds per day, 1.81 tons per month, and <br />21.74 tons per year <br />PM,o (Particulate Matter< 10 um): 194.3 pounds per day, 0.81 tons per month, and 9.72 <br />tons per year <br />During the first twelve (121 months of operation, compliance with the daily, monthly, and yearly <br />emission limitations shall be required. After the first twelve 112) months of operation, compliance <br />with only the daily and yearly limitations shall be required. Compliance with the yearly emission <br />limits shall be determined on a rolling twelve 112) month total. <br />• <br />The permit holder shall calculate emissions monthly and keep a compliance record on site in order <br />to demonstrate compliance with the above emission limitations. After the first twelve 1121 months <br />of operation, the permit holder shall calculate annual emissions by the end of each month. Annual <br />emissions shall be calculated based on the previous twelve 112) months' emission data. These <br />calculated annual emissions shall be used to demonstrate compliance with the yearly emission limit <br />listed above. <br />5. Thirteen of the eighteen transfer points shall be fully enclosed. <br />6. Applicant shall install and operate a PM,p monitor in the East Mine area. The location of the monitor <br />to be agreed upon between the Division and the applicant prior to installation. Monitoring shall be <br />started at least 30 days prior to startup of the mine. If the monitor shows exceedence of the <br />National Ambient Air Quality Standard (NAAQS) for PM,a, then the applicant shall implement <br />improved emission controls until the NAAQS is met or shall install perimeter fencing per Chuck <br />Machovec's July 30, 1998 memo to Dennis Myers. <br />Until PM,o data demonstrating compliance with the NAAQS is available from the monitor, public <br />access shall be precluded from the area of concern (page 3, recommended permit condition number <br />3., from Chuck's memo) per page 3, next to the last paragraph of Chuck's memo. <br />7. This source is limited to the following maximum number of hours of operation. A log shall be <br />maintained on site listing the actual number of hours of operation per day, and shall be made <br />available upon request to the Division. <br />Hours of operation shall not exceed 16 hours per day. <br />u <br />29/8/6 <br />