Laserfiche WebLink
<br />STATE OF COLORADO <br />COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT oF~coea <br />AIR POLLUTION CONTROL DIVISION '`~~ <br />TELEPHONE: (303) 692-3150 •e/ <br />~ r876 <br />CONSTRUCTION PERMIT <br />PERMIT NO: 11 DL252-2 <br />INITIAL APPROVAL <br />DATE ISSUED: March 26, 1999 Transfer of Ownership 2 and Modification <br />ISSUED TO: BOWIE RESOURCES LIMITED <br />THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS: <br />Coal mine known as Bowie #1 located at 1720 4010 Drive, Paonia, Delta County, <br />Colorado. <br />THE SPECIFIC EQUIPMENT OR ACTIVITY SUBJECT TO THIS PERMIT INCLUDES THE FOLLOWING: <br />Conveyors and transfer points from mine portal to crushing and screening buildings. <br />• THIS PERMIT IS GRANTED SUBJECT TO ALL RULES AND REGULATIONS OF THE COLORADO AIR <br />QUALITY CONTROL COMMISSION AND THE COLORADO AIR QUALITY CONTROL ACT C.R.S. (25-7-101) <br />e se ), TO THOSE GENERAL TERMS AND CONDITIONS SET FORTH ON THE REVERSE SIDE OF THIS <br />DOCUMENT AND THE FOLLOWING SPECIFIC TERMS AND CONDITIONS: <br />1. Visible emissions shall not exceed twenty percent (20%) opacity during normal operation of the <br />source. During periods of startup, process modification, or adjustment of control equipment visible <br />emissions shall not exceed 30°,6 opacity for more than six minutes in any sixty consecutive <br />minutes. Opacity shall be measured by EPA Method 9. (Reference: Regulation 1, Section II.A.1.& <br />4.) <br />2. This source shall be limited to a maximum production rate as listed below and all other activities, <br />operational rates and numbers of equipment as stated in the application. Monthly records of the <br />actual production rate shall be maintained by the applicant and made available to the Division for <br />inspection upon request. (Reference: Regulation 3, Part B,III.A.4) <br />Production of coal shall not exceed 10,000 tons per day, 83,333 tons per month or 1,000,000 <br />tons per year. <br />During the first twelve 1121 months of operation, compliance with the daily, monthly, and yearly <br />production limitations shall be required. After the first twelve 112) months of operation, compliance <br />with only the daily and yearly limitations shall be required. Compliance with the yearly production <br />limits shall be determined on a rolling twelve 112) month total. <br />• <br />29/8112 <br />12-3 ~. <br />~~ a~o 0 <br />