My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO21829
>
Back File Migration
>
Hydrology
>
HYDRO21829
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:43:04 PM
Creation date
11/20/2007 2:32:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
Hydrology
Doc Date
10/23/1998
Doc Name
3rd Qtr 1998 Inspections
From
SENECA COAL CO
To
DMG
Permit Index Doc Type
SEDIMENT POND INSPECTIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PBRIODIC INSPECTION PORN <br />Stockposde or Sumps <br />INSPECTOR'S NAME: Roy Raro <br />FACILITY CONFIGURATION: Stockoond <br />SITE NAME: T-1 <br />MINE NAME: s n a ii <br />MINE I.D. NO.: r_-80-005 <br />1 <br />2 <br />DATE: 09/28/98 <br />DATE LAST INSPECTION: 05/12/98 <br />LOCATION: cF.l~cW3~,, Sec 2 TcN R87W <br />LOCATION: 7.1 mi SE of Hayden CO <br />OWNER'S REP.: Brad Rrown Gen Mgr <br />Angle of elope: 3:1 upstream, ae1 downstream <br />*Seepage (specify location, color, and approximate volume) <br />At isolated points on embankment slopes: <br />At natural hillside: <br />over widespread areas: <br />From downstream foundation area: <br />"Boil e•' beneath stream or ponded water: <br />3. Cracks or scarps on crest: <br />4. Cracks or scarps on elope: <br />5 <br />6 <br />7 <br />Sloughing or bulging on elope: <br />*Major erosion problems: <br />Surface movements in valley bottom or on hillside: <br />8. *Eroeion of toe: <br />9. *Water impounded against downstream toe: <br />10. Existing embankment freeboard: Annroximately <br />11. Increase Decrease in water level: No change <br />12. Cracks, bulging, or erosion on upstream face: <br />13 <br />14 <br />Spillway erosion: _ <br />*Clogging <br />Spillway channels: <br />Diversion ditches: <br />Yes ~ N/A <br />Yes ~ N/A <br />Yee ~ N/A <br />Yee ~ N/A <br />Yee ~ N/A <br />Yee Q N/A <br />Yes N/A <br />Yee ~ <br />No N/A <br />~ feet <br />feet <br />Yes ~Nyo~ N/A <br />Yee /NoJ N/A <br />Yes ~ N/A <br />Yea o N/A <br />*Major adverse changes in these items could cause instability and should be reported to <br />the Engineering Manager and Mine Superintendent for further evaluation. Adverse conditions <br />noted in these items should normally be described (extent, location, volume, etc.) in the <br />Total = 7:1 N/A <br />Yee o N/A <br />Yee o N/A <br />Yee ~ N/A <br />Yes ~ N/A <br />apace on the back of this sheet. <br />
The URL can be used to link to this page
Your browser does not support the video tag.