Laserfiche WebLink
30 TAC 33!.163 hup~w.Inrccstate.tx.us/Rules/Iad30/t/3iI/J/331.163.himl <br />~ • <br />(2) characteristics of injection fluid; <br />(3) injection pressure; <br />(4) annular pressure; <br />(5) rate, temperature, and volume of injected Fluid; <br />(6) size of casing; and <br />(7) tensile, burst, and collapse strengths of the tubing. <br />(e) Logs and tests. <br />(1) Geophysical logging. Appropriate logs and other tests shall be conducted during the drilling and <br />construction phases of [he well including drilling into the salt. All logs and tests shall be interpreted by the <br />service company which processed the logs or conducted the test; or by other qualified persons. A <br />minimum of the following logs and tests shall be conducted: <br />(A) deviation checks on all holes, conducted at sufficiently frequent intervals to assure that avenues for <br />Fluid migration in the form of diverging holes are not created during drilling; <br />(B) a spontaneous potential and resistivity log for all formations overlying the caprock; <br />(C) from the ground surface or from the base of conductor casing to the total investigated depth including <br />all core hole or pilot hole: <br />(i) natural gamma ray log; <br />(ii) compensated density and neutron porosity logs; <br />(iii) acoustic or sonic log; <br />(iv) inclination (directional) survey; and <br />(v) caliper log (open hole); <br />(D) from the ground surface or from the base of conductor casing to the lowermost casing seat: <br />(i) cement bond with variable density log; <br />(ii) temperature log (cased hole); and <br />(iii) casing inspection log; <br />(E) fracture detector log from [he base of the surface casing to the total investigated depth including all <br />core hole or pilot hole. <br />(2) Pressure tests. <br />3 ors 4/I R/99 12'58 PM <br />