Laserfiche WebLink
<br /> <br />1 <br /> <br /> <br /> <br /> <br />MINREC, INC., NORTH THOMPSON CREEK MINES <br />1990 ANNUAL HYDROLOGIC REPORT <br />OCTOBER 1989 THROUGH SEPTEMBER 1990 <br />INTRODUCTION <br />The Operator completed reclamation of the North Thompson <br />Creek Mines during 1987. The No.l Mine was sealed during 1987 <br />with the expectation that no water would discharge from it again. <br />The No. 3 Mine was sealed, however pipes Caere placed in the <br />lowest seal to allow water to drain from the mine. <br />Current monitoring requirements are shown on pages 3-61 and <br />' 3-86 of the Permit. During 1988 page 3-86 was revised to include <br />a requirement to analyze the discharge from the No. 1 Mine water <br />treatment ponds annually in June. <br />' Monitoring data for this years report is segregated into the <br />follocaing appendices: <br />' appendix No. Monitoring Data <br /> <br />I <br />II <br />III <br />IV <br />North Thompson Creek <br />Upstream & Downstream Water Quality <br />1 <br />1 <br />1 <br />1 <br /> <br />1 <br /> <br />SURFACE WATER QUALITY <br />Refuse Pile Piezometers. D-lA & D-2A <br />Water Level, pH, Conductivity & Graphs <br />Mine Water Level <br />No. 3 Kline <br />Mine Discharge Quality <br />No. 1 Kline & No. 3 Kline <br />Appendix I contains the caster quality information collected <br />for North Thompson Creek. The quality information taken on North <br />Thompson Creek, in hlay and September, is designed to monitor <br />quality at the approximate high and low flow. <br />The variation of the quality of North Thompson Creek as it <br />passed the mines this ,year was similar to that which would be ex- <br />pected from the baseline monitoring data. <br />1 <br />