Laserfiche WebLink
iii i«iiii«~iii «i <br />999 <br />E~~.4 <br />s ~os~~ompa~Y Seneca Coal Company <br />RECEIVED <br />JAN 14 1999 <br />O~myun o1 Minerals & Geology <br />January 11, 1999 <br />Mr. Michael Boulay <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203-2273 <br />RB: Quarterly Sedimentation Pond Inspections - Seneca ii Mine <br />Dear Mr. Boulay: <br />Enclosed is the fourth quarter inspection reports for Ponds 002, <br />003, 004, 008, the PeCoCo Reservoir, Spill Control Pond #2 and <br />both truck wash ponds at the Seneca II Mine. All conditions <br />appeared stable and acceptable. <br />If you have any questions, please call <br />Sinc~~~; <br />Eng <br />Enclosure(s) <br />c: Dennis Jones (SCC) <br />la, P.E. <br />JAN 111999 <br />Seneca Coal Company • P.O. Drawer D • Hayden, Colorado 81639 <br />Telephone (970) 276-3707 • FAX (970) 276-3014 <br />