Laserfiche WebLink
<br />EXHIBIT L - Reclamation Costs <br />Final Grading & replacement of top soil <br />Preparation of seed bed <br />Fertilizer (80/20 nitrogen/phosphate) 200# @ <br />Western Wheatgrass 50# @ $1.60 <br />Tall Wheatgrass 70# @ .90~ <br />Alkali Sacaton (if available) 3# @ $5.50 <br />Labor <br />TOTAL for the first phase <br />1984 $4,989.50 <br />1987 6,486.35 <br />1991 8,432.25 <br />$19,908.10 <br />PHASE I <br />PHASE II <br />PHASE III (final) <br />152 <br />$4,000.00 <br />400.00 <br />30.00 <br />80.00 <br />63.00 <br />16.50 <br />400.00 <br />$4,989.50 <br />This reclamation will be carried out in three equal phases as <br />outlined in "Exfiibit E". The estimated costs for the first phase <br />are based on current prices with the second and third phase <br />reflecting a 30% estimated increase in costs. Each phase will <br />be slightly less than three acres in size for the purpose of <br />rec]amation. <br />.~ <br />EXHIBIT L - Reclamation Costs <br />