Laserfiche WebLink
<br /> <br />COAL COMPANY QUARTERLY POND INSPECTION REPORT <br />Inspector Name: LA/!RY R erc%l~e Date: 10-19.93 <br />Pond Number: S Date Last Inspection: ~-/x-97 <br />Site Name: L4mv ~.vRD Quarter: fr,~,z~~ CJ3 <br /> <br />1. Design Depth Measured From Spillway Invert /, 2 0 <br /> <br />2. Design Maximum Sediment Le vel Measured From Spillway Invert /,ao <br /> <br />3. Sediment Level/Pond Bottom Measured From Spillway Invert 2.30 <br /> <br />4. Water Level Measured From Spillway Invert .vy,,,e <br /> <br />5. Discharge Through Spillway Since Last Inspection Yes ~ No <br />6. Rills and Gullies Yes ~' No <br />7. Vegetation Adequate X Yes No <br />S. Outlet Channel Erosion Yes ~ No <br />9. Animal Burrows Yes ,r No <br />10. Cracks _ Yes ~_ No <br />11. Seepage Yes ~ No <br />12. Spillway Clogged _ Yes ,~ No <br />13. Valves Operational K Yes No <br />ADDITIONAL COMMENTS: <br />MAINTENANCE REQUIRED: _~vovz <br />- - ¢ f - <br />W W Q <br />3 ~ rP <br />SP/[lWAY INV! <br />-~--- - <br />~ ~ ~ 2 ~ ~ 4 ~ <br />~ O ~ ~ w <br />i ~ h •Wi A ...~1 <br />