Laserfiche WebLink
The spring/seep locations and monitoring wells are used to evaluate the occurrence of ground water, <br />hydraulic characteristics of ground water aquifers, and fluctuations in the elevation and quality of ground <br />water. The surface water monitoring sites axe used to evaluate fluctuations in the quality and quantity of <br />surface water. The locations of the monitoring stations are shown on the Ground Water and Surface Water <br />Hydrology Maps, (Maps 2.04-MS and 2.04-M6). Tables 2.04.7-T2, Ground Water Monitoring Summary, <br />and 2.04.7-T5, Surface Water Monitoring Summary, summarize the type and location of historic monitoring <br />sites. <br />The following summarizes the frequency of ongoing operational monitoring, as approved by DMG: <br />• Springs and Seeps -Discharge measurements and field water quality parameters axe collected <br />twice during the period June through October if sites are accessible. <br />• Stream Stations -Flow and field water quality parameters are measured on a monthly basis <br />from April through October if sites axe accessible. Water samples are collected (if flowing) fox <br />laboratory analysis once during the 2^d and 3rd quarters. The exception is monitoring Fox the <br />North Fork stations (NF-land 3), which continues on a year-round basis, including collection <br />of water samples during 4~ quarter. <br />BC-2 and BC-3 sites are only monitored fox flow and Feld parameters twice during June after <br />tributary flow has ended. <br />• Monitoring Wells -Ground water level measurements, field water quality parameters, and <br />laboratory samples were taken following well installation and development and water levels and <br />Feld parameters are measured twice during the period June through October if sites are <br />accessible. If ground water is present, a sample is collected for laboratory analysis during the <br />3~d quarter. <br />The water quality monitoring parameters list is presented in Table 2.04.7-T1, Surface and Ground Water <br />Monitoring Parameters. All water monitoring analysis results will be recorded, reviewed to identify <br />potential problems ox trends, and filed at the mine so as to be available for future inspection and review. In <br />addition at the end of each water year, OMLLC will tabulate all water monitoring data for the year, review <br />the data with respect to changes in surface and groundwater hydrology systems, and provide a summary <br />Annual Hydrology Report in compliance with the DMG schedule. OMLLC will continue to collect and <br />evaluate hydrologic monitoring data consistent with the I-Iydrologic Ivfonitoxing Plan during the operations <br />and xedamation phases. If the additional data resulting from ongoing hydrologic monitoring indicates that <br />any significant changes in general baseline characterizations are appropriate or that any assumptions ox <br />projections used to evaluate potential hydrologic impacts are inaccurate, they will be reviewed with <br />consideration of all available data. If the analysis of any surface water or ground water sample indicates <br />noncompliance with applicable permit conditions, then OMLLC shall promptly notify the DMG and <br />immediately implement accelerated ox expanded monitoring to determine the nature and extent of <br />noncompliance and results of noncompliance. <br />OMLLC will continue surface and ground water monitoring activities after completion of reclamation <br />operations to document restoration of pre-mining hydrologic characteristics. All surface and groundwater <br />monitoring installations and associated structures and equipment will be properly installed, maintained, and <br />operated to assure the accuracy and consistency of monitoring data. Surface water monitoring will be <br />discontinued when untreated surface runoff meets applicable effluent limitations and the DMG approves <br />removal of drainage and sediment control structures. Groundwater monitoring wells will be abandoned and <br />removed in accordance with applicable DMG guidelines and pemut commitments following DMG <br />approval to discontinue groundwater monitoring. <br />TR-45 2 Rev. Feb 2004 <br />