Laserfiche WebLink
4.7 Loading of Coal <br />• <br />Current plans call for hauling ,~f the mined coal to an existing <br />general loading site at a rail siding near Lacy. Due to volume <br />restrictions, this procedure will be replaced during the full <br />development of the mine some time after the first 5-year permit <br />period. Whether or not a permanent loadout facility is built will <br />depend upon many factors, particularly market conditions. <br />• <br />NCIG - Coal Ridge #1 4-92 ABC/1145/910509 • <br />