Doc Date:12/11/2001 III I II I II I II IIII III
<br />999
<br />•
<br />RULE 2 -PERMIT
<br />2.10 -MAPS AND PLANS
<br />The following subsections S,imm~n~r the requirements for mapping information to be included in
<br />the pemtit document, reference the specific maps providing the required information, and address the
<br />pemut approach relative to applicable regulatory requirements for supervision of map preparation
<br />and map review and certification.
<br />2.10.1 -GENERAL REQUIREMENTS
<br />Relevanc permit information, including information on properly ownership, environmental resources,
<br />and mining and reclamation operations, is graphically illustrated by appropriate figures and maps, as
<br />referenced and described in the text of the pemtit document. All maps and figures are presented at
<br />an appropriate scale to clearly show the relevant information and all maps include pertinent
<br />information on topography, drainage, and features as well as Mine Permit and lease boundaries.
<br />2.10.2 -PERMIT AND ADJACENT AREAS
<br />The Mme Plan Map, (Map 2.05-M2), shows the location and sequencing of historic, ongoing, and
<br />planned tnining operations, with sufficient information to clearly distinguish between Pre-Law (prior
<br />to August 3, 1977), Interim Program (between August 3, 1977 and May 3, 1978), and Permanent
<br />Program (subsequent to May 3, 1978) disturbances.
<br />• 2.10.3 -SPECIFIC INFORMATION REQUIREMENTS
<br />The permit maps and figures, as referenced by the List of Figures and List of Maps in this pemtit
<br />document, specifically provide the following information required under applicable provisions of this
<br />section (relevant maps referenced):
<br />• Surface and mineral ownership and boundaries within and contiguous to Permit Area
<br />(Surface and Mineral Ownership Map, (Map 2.03-M1)).
<br />• Boundaries of lands where OMI holds legal right of entry (Surface and Mineral Ownership
<br />MaP~ ~P 2.03-M1)).
<br />• Boundaries, sequence, and timing for rrtirting activities and affected areas over life of mine,
<br />(Mute Plan Map, (Map 2.05-M2)).
<br />• Locations of buildings within 1,000 feet of Pemtit Area and their current use (General
<br />Facihties Map, (Map 2.05-M1), Facility Detail Maps, (Map series 2.05-M3x), and Exhibit 2.05-
<br />E 1, Facilities Design)
<br />• Locations of all surface and subsurface tnamrrade features within, passing through, and
<br />passing over the Permit Area (General Facilities Map, (Map 2.05-M1), Facility Detail Maps,
<br />(Map series 2.05-M3x), and Exhibit 2.05-E 1, Facilities Design)
<br />• Public roads in or within 100 feet of the Perrnit Area (General Facilities Map, (Map 2.05-
<br />• Ml), Facility Detail Maps, (Map series 2.05-M3x), and Exhibit 2.05-E 1, Facilities Design)
<br />• Boundazies of any National Natural Landmazks, Designated Natural Areas, public pazks,
<br />cultural or historical resources eligible for listing on the National Register of I-Tistoric Places,
<br />or known archaeological sites (Not applicable).
<br />PR04 2.10-1 Revised August 2000
<br />
|