My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO21672
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO21672
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:43:00 PM
Creation date
11/20/2007 2:26:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1993059
IBM Index Class Name
Hydrology
Doc Date
8/8/2006
Doc Name
Substitute Water Supply Plan
From
OSE
To
Helton & Williamsen
Permit Index Doc Type
Correspondence
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Frank C. Healy <br />August 7, 2006 <br />Page <br />7. The operation plan for 2004 through 2005 is formally approved by this letter. This plan shall <br />be valid through April 30, 2007, unless otherwise revoked or modified. <br />8. This.plan may be revoked or modified at any time should it be determined that injury to <br />other vested water rights has or will occur as a result of the operation of this plan. <br />9. Should this substitute water supply plan expire without renewal or be revoked prior to <br />adjudication of a permanent plan for augmentation, all ground water pumping and mining of <br />product from below the ground water table must cease immediately. <br />10. In accordance with amendments to Section 25-8-202-(7), C.R.S. and "Senate Bill 89-181 <br />Rules and Regulations" adopted on February 4, 1992, the State Engineer shall determine <br />whether or not the substitute supply is of a quality to meet requirements of use to senior <br />appropriators. As such, water quality data or analysis may be requested at any time to <br />determine if the water quality is appropriate for downstream water users. <br />11. Acceptance of these conditions shall be assumed unless a letter to the contrary is received. <br />by this office, the Division Engineer (Steve Witte, 310 E. Abriendo, Suite B, Pueblo CO <br />81004), and the Water Commissioner (Dan Neuhold, 30240 County Road 12, Lamar, CO <br />81052) within two weeks of your receipt of this letter. <br />Should you have any questions, please contact Heidi Frey of this office or Kalsoum <br />Abbasi, in our division 2 office in Pueblo at (719) 542-3368. <br />Sincerely, <br />~~~ <br />~t31>;k Wolfe P.E. <br />Assistant State Engineer <br />cc: Bill Tyner, Assistant Division Engineer <br />Dan Neuhold, Water Commissioner <br />DMG <br />Attachment: Attachment 6 <br />DW/HCF:word/midwestem farms M-93-59 2006.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.