Laserfiche WebLink
~, <br /> <br />PART I <br />Page 7 of 19 <br />E. SPECIAL. REQQIRE.`fF.YTS (CONY=`7IIED) <br />1. "faterials Containment Plan (Continued) <br />e) Aa implementation schedule far additional facilities which might be <br />required is (c) above, but which are not yet operational; <br />f) A list of available outside contractors, agencies, or other bodies <br />which could be utilized Sn the event of a spill in order to clean <br />up its effects. If the facility is capable of handling spills <br />in-house, this shall be documented in the plan; <br />g) Provision for yearly review sad updating of the contingency plan, <br />plus resubmlasion of the plan to the Division if conditions sad/or <br />procedures at the facility change the original plan. <br />The foregoing provisions shall is ao way reader inapplicable those <br />requirements imposed by Section 311 of the Water Pollution Control Act <br />Amendmeata of 1972, regulations promulgated thereunder, the Colorado <br />Slater Quality Control Act, sad regulations promulgated thereunder. <br />This plan should be prepared by a professional engineer registered Sn <br />thn State of Colorado. <br />Nothing herein contained shall be construed as allowing any discharge <br />to eaters of the State other than through the discharge points <br />specifically authorized is this permit. Nothing herein contained shall <br />be construed as ezcueing any liability the permittee might have, civil <br />or criminal, for any spill. <br />The submittal of an Spill Prevention Control and Countermeasure Plan <br />(SPCC Plan) as required by 40 CFB Part 112 may satisfy all or part of <br />this requirement. Should additional materials ezist on site which are <br />not addressed is the SPCC Plan, addressing those materials as per [he <br />above will be required. <br />Code: i - 21 Date: 1 - 84 <br /> <br />