Laserfiche WebLink
Idantificetion <br />of Pond <br />During InspecT3on: <br />mate Water Level <br />nt (% total storage) <br />(cfs) <br />Rills & Gulleys <br />Inadequate Vegetation <br />Outlet Channel Erosion <br />Burrows <br />QUARTERLY POND INSPECTION REPORT <br />Bowie Resources Limited <br />Bowie No. 2 Mine - C-96-083 <br />Quarter. <br />Inspection <br /> <br />B C D -Gob Pile F • New Gob J UTL East K IJTL West <br />Sediment Sediment - Sediment Sediment Sediment Sediment <br />50% <br />No <br />Differential Settling <br />Cracks or Slides <br />Seepage <br />purtenant Structures <br />Defective Spillways <br />Dewatering Devices Clogged <br />Faulty Gates, Etc. <br />Comments <br />Required: <br />of Inspector: Jim Stover <br />The water in Ponds B, C 8 D was above the level of the primary spillway. <br />Sediment was removed from Pond B during the quarter. <br />Small pool of water in Pond J, probably irrigation seepage. <br />Design depth measured tmm pond bottom to invert of emergency spillway: <br />Pond B=70, C=10, 0=7.7, J=B, K=4 <br />Dewater Ponds B and C. <br />0 <br />e''0 RF °° <br />,gyp ss Cy SI F~ <br />• ~'tQ //> Gam: C°~ <br />P. E. <br />