My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO21629
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO21629
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:42:59 PM
Creation date
11/20/2007 2:25:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
Hydrology
Doc Date
1/12/2007
Doc Name
3rd Qtr 2006 Review Letter
From
DRMS
To
National King Coal
Permit Index Doc Type
Sediment Pond Inspections
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />7373 Sherman St., Room 275 <br />Denver, Colorado 80203 <br />Phone: 1303) 866-3567 <br />FAX: (303) 832-8106 <br />January 12, 2007 <br />Mr. Tom Bird <br />National King Coal, LLC <br />P.O. BOX 2827 <br />Durango, CO 81302 <br />Re: National King Coal LLC, permit C-81-035 <br />Coal Waste Pile Report for 3rd Quarter, 2006 <br />Pond Inspection Report for 3rd Quarter, 2006 <br />Dear Mr. Bird: <br />COLORADO <br />DIVISION OE <br />RECLAMAr[ON <br />MINING <br />- Sc- <br />SAFETY <br />gill Owens <br />Governor <br />Russell George <br />Executive Director <br />Ronald W. Cattany <br />Division Director <br />Natual Resource Trustee <br />The Division's review found that, with one exception, the above-referenced reports <br />satisfy the reporting requirements for coal waste piles and ponds for the 3`d Quarter, <br />2006. The reports were well-prepared and contained the required information, but the <br />refuse pile report was filed a few weeks late. When filing future waste pile reports, <br />please be aware of Rules 4.10.2(2) and 4.09.1(11)(b) which require submitting the report <br />to CDRMS within two weeks following the inspection. <br />Copies of memos summarizing our review aze attached. <br />If you have any questions, please do not hesitate to call me. <br />Sincerely, <br /> <br />Tom Kaldenbach <br />Environmental Protection Specialist <br />cc: Daniel L Hernandez <br />Office of Office of <br />Mined Land Reclamation Active and Inactive Mines <br />
The URL can be used to link to this page
Your browser does not support the video tag.