Laserfiche WebLink
• SENECA COAL COMPANY -POND 11A CONSTRUCTION <br />Work: Structural FiIJ/Soils Nuclear Density Test Result Summary <br />Project Location: Hayden, Colorado <br />Project Number: 2470108 <br />Field Technician: John Pellicer <br />Summary Work Performed By MWH COA Field Engineer <br />Dam Construction: <br />Between July 8, through July 26, 2004, a MWH CQA Field Engineer made 5 trips to Seneca Coal's Pond <br />11 A Construction Site to perform Nuclear Density Testing on the structural fill being placed to build the <br />Pond 1 I A dam. Nuclear density gauge (Troxler) testing took place at random times and locations <br />throughout the entve construction phase. A total of 13 tests were taken during dam construction. See the <br />attached testing data sheet for specific test dates and results. All tests exceeded the required 95% <br />compaction of Standazd Proaore (ASTM D698). <br />• <br />• <br />