My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO21619
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO21619
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:42:59 PM
Creation date
11/20/2007 2:24:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
Hydrology
Doc Date
10/23/1998
Doc Name
SENECA II-W MINE C-82-057 QTR STOCKPOND INSEPECTIONS
From
SENECA COAL CO
To
DMG
Permit Index Doc Type
SEDIMENT POND INSPECTIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P$RIODIC INSPECTION FORK <br />Stockponds or Sumps <br />INSPECTOR'S NAME: Boy Karo DATE: 09~3,(1/9A <br />FACILITY CONFIGURATION: ~fo Hood DATE LAST INSPECTION: 05/12/9A <br />SITfi NAME: T-24 LOCATION: SW~NR~ SP TSN. RBAW <br />MINE NAME: Seneca SI-W LOCATION: 8 mi 5 of Hayden, CO <br />MINE I.D. NO.: C-A2-057 OWNER'S REP.: Arad Brown. Gen Mar <br />1. Angle of elope: 3.9:1 upstream, 4.6e] downstream Total = B S.1 N/A <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />*Seepage (specify location, color, and approximate volume) <br />At isolated points on embankment slopes: <br />At natural hillside: <br />Over widespread areas: <br />From downstream foundation area: <br />"BOile'• beneath stream or ponded water: <br />Cracks or scarps on treat: <br />Cracks or scarps on elope: <br />Sloughing or bulging on elope: <br />*Major erosion problems: <br />Surface movements in valley bottom or on hillside: <br />8. *Erosion of toe: <br />9. *Water impounded against downstream toe: <br />10. Existing embankment freeboard: Annroximately <br />11. _1L Increase Decrease in water level: <br />12. Cracks, bulging, or erosion on upstream face: <br />13 <br />14 <br />Spillway erosion: _ <br />*Clogging <br />Spillway channels: <br />Diversion ditches: <br />Yee <br />Yes <br />Yee <br />Yee <br />Yee <br />Yee <br />Yee <br />Yes <br />Yes <br />Yes <br />Yea I~ <br />Yea N~ <br />5.7 feet <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />D.5 feet <br />Yes ~ N/A <br />Yes ~ N/A <br />Yea N/A <br />Yee o N/A <br />*Major adverse changes in these items could cause instability and should be reported to <br />the Engineering Manager and Mine Superintendent for further evaluation. Adverse <br />conditions noted in these items should normally be described (extent, location, volume, <br />etc.) in the apace on the back of this sheet. <br />
The URL can be used to link to this page
Your browser does not support the video tag.