Laserfiche WebLink
r <br />f. Quanntarivt Lopata aJ dliiwg <br />areal extent of the mine (Table 5) to determine mine inflow from the face and roof respectively. <br />Three scenarios were examined: the existing configuration of the Golden Eagle Mine, the <br />configuration for the current permit term, a~ the life-of--mine conf guration. Case: II inflow <br />predictions utilizing the maximum coal ~n~+~ivity of 1.98 fiz/day appeared to hest nepr+eseet <br />the situation currently observed at the mine (Table 6). <br />Currently the mine is producing an average of 0.14 gpm/acre of mine. Over the last five yeaz, <br />inflow has ranged from 0.09 gpm/acre to 0.125 gpm/acre. Figure 6 is a diagram of seepage <br />rates by acres of mined coal over time. This curve corresponds well with the seepage rates <br />anticipated in the 1980 study, and, due to the homogeneity of stratigraphy, structural geology, <br />topography, and climate, may represent a good way to project future inflows based on total acres <br />mined. Figure 6 also shows a graph of inflows from shafts and holes by acres of auned coal. <br />The slight decline in gpm/acre might represent an offset from dewatering of perched water tables <br />at old sites to additional inflow from newer sites. <br />There will continue to be a constant inflow of 80 to 100 gpm associated with the SE-]. TG fault. <br />The mine is currently using the discharge for underground dust suppression activities. Should <br />the mine encounter another fault of comparable magnitude, inflows will increase t~eyond the <br />current projection. The station for measuring the flow from the fault was relocated, and now <br />includes some seepage flow (results in an appazent increase in fault flow and decrer:se in atra <br />seepage). The flow from the fault itself may be leveling off to a sustained production From <br />rechazge. <br />During the third quarter of 1989, the New Elk Mine was temporarily sealed. Previous mine <br />inflow studies recorded inflows of approximately 123 gpm, of which 109 gpm was being <br />generated from mined out azeas totaling approximately 2800 acres. Any mine uiflows are <br />currently flooding the abandoned mine workings. <br />An estimation of the extent of flooding within the workings was [Wade. This analysvs assumed <br />that all azeas of the mine below the elevation of 7062' were equally flooded. A copy of the <br />mine trap was acquired and the extent of mains was measured at 286 acres. The coal reportedly <br />averaged 8 feet in height in this area, and the mining resulted in 70 percent recovery of the coal. <br />The length of the flood limit line on the floor of the mine is 13850 feet. <br />(286 ac) x (43560 ftz/ac) x (8 ft) x (60%) = 59,799,168 ft' <br />(if flooded from floor to roof), minus <br />(8 ft) x (13850 ft) x (8 ft) / (4.5%) / 2 = 9,848,889 ft' <br />(perimeter correction), equals <br /> <br />18 <br />