My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE50213
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE50213
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:54:52 PM
Creation date
11/20/2007 2:23:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977211
IBM Index Class Name
Permit File
Doc Name
APPLICATION 77-211MINING PLAN
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />It is estimated that Pikeview Quarry contains approximately 58 million tons <br />of limestone. It would take approximately 42 years to mine and sell limestone <br />extracted from a quarry of this magnitude. <br />The present day requirement for limestone exceeds 250,000 tons per year. <br />Future requirements for limestone in the year of 2000 is anticipated to exceed <br />two million tons per year. <br />The following data and attached Mining Timetables were prepared based upon the <br />estimated limestone contained in each tract: <br />Tract "A" (81 Acres): <br />Contains 34 to 36 million tons of limestone. This area is constantly <br />being disturbed because of the interior mining roads and plant. This <br />disturbance will probably continue during the entire life of the mine. <br />The estimated mining extraction period is 25 years. <br />Tract "A-1" (3 Acres): <br />Contains one-half million tons of limestone. Mining to begin in <br />1980 and last for 2 years. <br />Tract "A-1" (11 Acres): <br />To be future office, plant, and storage area. This condition to begin <br />in 1981, and to continue through the entire period of the mining operation. <br />Tract "B" (25 Acres): <br />Contains 9 to 11 million tons of limestone. This will require a mining <br />extraction period of 17 years beginning in 1983. <br />Tract "C" (14 Acres): <br />Contains 5 to 7 million tons of limestone. Area is now being mined. <br />This mining operation is expected to continue for approximately 9 years. <br />~TTc N 3 <br />SNe~T 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.