Laserfiche WebLink
<br />AREA 2 <br />Parachute Facilities <br /> <br />u <br />Area 2 is divided into the following four subareas <br />2a - No Work Planned Through 1984 <br />2b - Inactive Terminal Area <br />2d - Mahaffey Ranch <br />1982 Activi <br />(refer to Figure D-3). <br />Subarea 2b - Interim stabilization by revegetation of 50 acres of mild slope <br />using Technique 4 and fertilizing an additional 28 acres using 200 lbs/acre of <br />33-0-0 fertilizer. <br />Subarea 2d - Permanent reclamation by replacement of topsoil and revegetation <br />of 2 acres of semi-steep slopes by Technique 3 and 28 acres of mild slopes using <br />Technique 4. <br />1983 Activit <br />Subarea 2b - Interim stablilization by revegetation of 20 acres of mild slopes <br />using Technique 4 and fertilizing 78 acres using 200 lbs/acre of 33-0-0 fertilizer. <br />This includes reseeding up to 40% of 1982 revegetation work, depending upon the <br />success of previous plantings. <br />Subarea 2d - Permanent reclamation by revegetation of 0.5 acres of semi- <br />steep slopes by Technique 3, 7 acres of mild slopes using Technique 4 and <br />fertilizing 30 acres using 200 lbs/acre of 33-0-0 fertilizer. This includes <br />reseeding up to 25% of the 1982 revegetation work, depending upon the success of <br />previous plantings. <br />PD 1000.102 A10 <br />