Laserfiche WebLink
• AREA 8 <br />DAM ACCESS ROAD <br />Area 8 is divided into 2 subareas: <br />8a - Cut/Fill Slope Along Road (New and Old) <br />8b - Summit Office Site <br />1982 Activi <br />Subarea 8a - Permanent reclamation by replacement of topsoil and re- <br />vegetation of 3.5 acres of mild slopes by Technique 4. <br />1983 Activi <br />Subarea 8a - Permanent reclamation by revegetation of 10 acres of steep <br />slopes using Technique 1, 10 acres of semi-steep slopes using Technique 3, 1 <br />acre of mild slopes by Technique 4, and fertilizing 3.5 acres using 200 <br />lbs/acre of 33-0-0 fertilizer. This includes reseeding up to 25% of 1982 <br />• revegetation work, depending upon the success of previous plantings. <br />1984 Activity <br />Subarea 8a - Permanent reclamation by revegetation of 2.5 acres of steep <br />slopes using Technique 1, 2.5 acres by Technique 3, and fertilizing 23.5 <br />acres using 200 lbs/acre of 33-D-0 fertilizer. This includes reseeding up to <br />20% of 1982 revegetation work, depending upon the success of previous plantings. <br />Subarea 8b - Permanent reclamation by revegetation of 6.5 acres of mild <br />slopes by Technique 4. <br /> <br />PD 1000.102 A18 <br />