Laserfiche WebLink
<br />-3- <br />determined: <br />b) The Board will errter the lands to perform reclamation arly if the Board has <br />not beeo performed, and <br />i. that reclamation required by law to have heal performed upon such lands has <br />ii. that financial warranty forfeihue proceedings described m the Act or sirrtilar <br />provisions of subsequent laws, if any, have bear initiated. <br />c) The Divisim, acting for the Board, will arter lands to respond to an emergency only <br />where the Division determines that any of the conditions of Construction Material Rule 8.4.2. exist. <br />7) The additional conditions set forth m the attadred rider, if any, are incorporated herein by <br />reference. <br />// a) Rider is attached. <br />/ XX / b) No rider is attached. <br />MINED LAND RECLAMATION BOARD <br />COLORADO DEPARTMENT OF NATURAL RESOURCES <br />MICHAEL B. LON <br />Division Director <br />