Laserfiche WebLink
~~ <br />Steven M. Maly Page 3 <br />October 14, 2003 <br />10. This plan may be revoked or modified at any time should it be determined that injury to other <br />vested water rights has or will occur as a result of the operation of this plan. <br />11. Should this substitute water supply plan expire without renewal, all diversions must cease <br />immediately. <br />12. In accordance with Section 37-92-308(5)(a)(IV), C.R.S., the state engineer shall determine <br />whether the substitute supply will prevent material injury to other water rights and decreed <br />conditional water rights, including water quality and continuity to meet the requirements of <br />use to which the senior appropriation has been applied. <br />Should you have any questions, please contact Heidi Frey of this office or Brian <br />Boughton, Augmentation Coordinator, in our Division 2 office in Pueblo at (719) 542-3368. <br />Chief Deputy State Engineer <br />' cerel~ <br />~~~ <br />Kenneth W. Knox ~ <br />cc: Steve Witte, Division Engineer <br />Bruce Smith, Water Commissioner <br />DMG (file no. M-2000-98) <br />KWK/HCF:monarch quarry.doc <br />