My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE50147
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE50147
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:54:50 PM
Creation date
11/20/2007 2:21:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981021
IBM Index Class Name
Permit File
Doc Name
Application & Correspondance
From
UMETCO MINERALS CORP
To
MLRD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~' <br />~ UNION I;ARBIDE CORPORATION <br />' ~ METALS DIVISION <br />URAVAN,CDLO RA DO 81436 <br />April 3, 1984 <br />Mr. Mark Loye <br />Senior Reclamation Specialist <br />Mined Land Reclamation Division <br />423 Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />6`~~~~9~~~°,~'~ <br />P.PP C 19~~1 <br />~AIM~n i ~,~n non, eu.-.... <br />""LION <br />.~ <br />Re: Temporaty Cessation: <br />West Sunday #81-21 <br />Pursuant to Section 1.6, Mineral Rules and Regulations, Union Carbide requests <br />temporary cessation on the West Sunday permit number 81-21. In compliance <br />with Section 1.6, the f~~llowing information is submitted. <br />The West Sunday was placed on standby on December 23, 1983. The mine is in <br />the primary development stage and the ore body has not been reached. Ore <br />reserves as of January 1, 1984 are 270,700 tons. <br />Operations were placed on standby due to the depressed price and demand for <br />uranium concentrates. Estimated resumption of operations is 1986. <br />Entry into the mine situ and underground working is secured by locked gates. <br />The ventilation raise h•3s a fan installation. <br />Union Carbide feels that no problems exist as to waste pile stability or <br />errosion at the site. Union Carbide will monitor the area to assure <br />compliance of permit stipulations. <br />Feel free to contact me if you have questions. <br />Your very truly, <br />. R. Evans <br />Uravan Mine Superintendent <br />RRE:ac <br />
The URL can be used to link to this page
Your browser does not support the video tag.