Laserfiche WebLink
U <br />..~ . <br />~ UNION CARBIDE CORPORATION <br />' ~ METALS DIVISION <br />URAV AEI, COLO RA DO 83436 <br />;7 <br />l ~ L~ V ~ 7 £7 ~. 6.l~ <br />April 14, 1981 <br />APR 1 7 1981 <br />R.C. Campbell <br />Mined Land Reclamation <br />423 Centennial Building <br />1313 Sherman Street <br />Denver, CO 80203 <br />Dear Bob: <br />(491NfD LAND RECLA?r?AT!^".l <br />Colo. Dept. cf i'a;!:•;.I r,~...:c« <br />The Following should serve to answer the questions of your letter dated March 6, 1981 <br />regarding the West Sunday Mine permit application, File #81-21. <br />1. Premining and mining plan map: <br />A revised prernining and mining plan map (Exhibit C-Plate A) <br />and an additirmal 200' scale map (Exhibit C-Plate B) are <br />enclosed and ~>how the complete access road and vegetative <br />covering. <br />2. Reclamation Plan Map: <br />A revised map indicating the anticipated changes in contour <br />interval is enclosed. <br />3 Water Resources: <br />Although it i<.: anticipated that some water may be encountered <br />in the mining or development phases of this project it is not <br />possible at this time to determine the location or quantities <br />until such encounters occur, if any. If significant quantities <br />of water are encountered such that a beneficial underground use <br />may be derived and/or pumping and surface storage is required, <br />the necessary permits will be obtained at that time. <br />4. Reclamation Costs: <br />A re-evaluation of reclamation costs indicate the original <br />reclamation estimate (Exhibit L) to have been over stated by <br />a significant amount. It is requested that the estimated <br />reclamation costs be revised as follows: <br />Clean-up - Removal of buildings, equipment, debris, <br />etc. Buildings to be sold for salvage, with removal <br />by bidders, significantly reducing costs. $6,000.00 <br />Earthmoving - Recontouring, retopsoiling, scarifying <br />seed bed preparations etc. $11,400.00 <br />Re-vegetation - Seeding, 20 ac. at $400.00/ac.$8,000.00 <br />$25,400.00 <br />