Laserfiche WebLink
QUARTERLY POND INSPECTION REPORT <br />THE PITTSBURG & MIDWAY COAL MINING CO. <br />EDNA MINE <br />Pond Identification: CHECK DAM !!11 <br />Type Of Pond: EARTHEN CHECK DAM STRUCTURE <br />Operational Status At Time of Inspection <br />Approximate Water Level: ESTIMATED 1 0 FT BELOW DI H_ARGE ELEVATION <br />Sediment Level (%) Total Storage: ESTIMATED 35% FULL <br />Outflow Icfsl: NONE <br />Features <br />Status <br />Comments <br />Erosional: <br />Rills & Gullies On Embankment ok <br />Vegetation ok <br />Outlet Channels ok <br />Other <br />Pand Structure: <br />Settling ok <br />Cracks Or Slides ok <br />Seepage ok <br />Other <br />Appurtenant Structures: <br />Primary Spillway ok <br />Secondary Spitlway No Secondary Spillway <br />Other <br />Additional Comments: <br />Structure appeared to be competent and functioning properly. <br />Small amount of fabric exposed on center ridge side of project. <br />Condition must be monitored in future inspections. <br />Small piles of salt surround pond. <br />Site covered with 2" of snow. <br />Inspected By: ~r- <br />hris Miller <br />Date: December 6, 1 999 <br />