Laserfiche WebLink
<br />above the pond, it is likely that additional theoretical remodeling could show that the pond will <br />soon be vastly oversized as compazed to the topsoil stripping modeling scenazio. It is likely that <br />at some future date it may be appropriate to modify the modeling assumptions for the pond to <br />arrive at less conservative volumetrics. <br />As we discussed, to clarify the operation of the sedimentation ponds we propose to revise <br />Permit page 4.05-7 and include the change with the MR to be submitted in December for [he <br />West Pit as noted in the inspection report of November 17, 1995. <br />Please contact me if you have any questions concerning this information. <br />Sincer~ ~ ~` <br />mes A. Kiger <br />Sr. Environmental Engineer <br />Attachment <br />xc: R.G. Atkinson <br />Files <br />