My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO21437
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO21437
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:42:54 PM
Creation date
11/20/2007 2:19:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
Hydrology
Doc Date
2/6/2003
Doc Name
2001 Sediment Pond Report Review Memo
From
Janet Binns
To
File
Permit Index Doc Type
Sediment Pond Inspections
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTEROFFICE MEMORANDUM <br />TO: C-1981-044 FILE. <br />FROM: J~\NG'l' BINNS <br />SUBJECT: REVIEW F 2001 I NT POND REPORTS <br />DATE: 2/6/03 <br />CC: DAN HGRNANDFZ <br />First quarter 2001 Sediment Pond inspection reports were reviewed. First quarter 2001 report was received in the <br />DMG office on August 1, 2001. Inspections were conducted on 3/20/01 and 3/28/01, No significant concerns were <br />identified in the reports. Ponds axe snow and ice covered. A note regazding seeping at 5-P5, 5-P6, and 5-P7 required <br />follow-up. <br />Second quarter 2001 Sediment Pond inspection reports were reviewed. Second quarter 2001 report was received in the <br />DMG office on August 1, 2001. Inspections were conducted S/16/01. 5-Pl, 5-P2, and 5-P3 sediment traps requited <br />maintenance to "dig-out" outlets. Source of seepage water at sediment ponds 5-P5, 5-P6, and 5-P7 had not been <br />Identified at this inspection. <br />'Third quarter 2001 Sediment Pond inspection reports were reviewed. Third quarter 2001 report was received in the <br />DMG office on August 1, 2001. Inspections were conducted on 7/25/01 and 9/16/01. 5-P5, 5-P6, and 5-P7 ponds <br />slated for repair of seepage with contractor. No other problems noted. <br />Fourth quaztex 2001 Sediment Pond inspection reports were reviewed. Fourth quarter 2001 report was received in the <br />DMG office on April 22, 2002. Inspections were conducted on 11/13/01. 5-P5, 5-P6, and 5-P7 ponds have been <br />repaired. No other problems noted. <br />
The URL can be used to link to this page
Your browser does not support the video tag.