Laserfiche WebLink
• References: <br />1. Burlington Northern Inc., 1978, Special Plan-Roadbed Section, Engineering Division, Drawing No <br /> C6060.0 <br />2. Union Pacific Railroad Company, (1992), Technical Specifications for Industrial Tracks, AVP <br /> Engineering Management, Omaha, Nebraska, 68179, February, 1992 <br />3. American Railway Engineering Association, (1985), Manual for Railway Engineering <br />4. Michael W. West & Associates, Dec. 22, 1999, Project No. 99348, Geological and Geotechnical <br /> Studies, Proposed Rail Spur, Plant Site to Existing Rail Lines, Rio Grande Red Rock Site, Pueblo <br /> County, Colorado <br />5. Michael W. West & Associates, Geological and Geotechnical Studies, Proposed Access Road, <br /> Plant Site to SL Charles River Bridge, Rio Grande Red Rock Site, Pueblo County, Colorado, <br /> Project No. 99347 <br />6. Pueblo County Department of Public Works, Pueblo County, Colorado, 1998, Pueblo County <br /> Roadway Design and Construction Standards. <br />7. CDOT, 1995, Design Guide Volume 1 (AASHTO Chapters) <br /> <br />~~~~~~~D <br />~,~ t~v <br />Divis~pP °t M~ <br />~°~CEfVED <br />M,~? :~ <br />D...., <br />....,,,..... r.sa~Mr <br />