Laserfiche WebLink
The Operator proposes the following bond: <br />1. Two acres affected by mining per year X $990. 00 = $1, 950. 00, <br />(Marked in Red) <br />2. Two acres reclaimed per year ?C $990 $1, 960. 00. <br />(Marked in Yellow) <br />3. Two acres waiting for re vegetation success x $270.00 = $540.00. <br />Total Bond would be for $4,460.00. <br />This will be for the duration of the mine w?~ich will be a floating bond since <br />the reclamation will be done in conjunction with mining. (Refer to Mining and <br />Reclamat ion Timetables„ Pages "D-16" and "E-19"). <br />"L-Z ' <br />