My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE50056
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE50056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:54:48 PM
Creation date
11/20/2007 2:18:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985173
IBM Index Class Name
Permit File
Doc Date
9/9/1985
Doc Name
REGULAR 112 PERMIT APPLICATION FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECLAMATION PLAN -Exhibit "E" Part II (Continued) <br />STAGE TWO <br />1. Remove fines and reclaim the area with rapid growth type plant cover of Russian <br />Wild Rye (5 lbs. /acre) a.nd Western Wneatgrass (5 lbs. /acre) in the fall of 1985. <br />A & S Construction Company will reclaim the area in the fall of 1985, as indicated, <br />to protect the area until it is mined is the future. (Approximately 2 1/2 acres). <br />Landowner may farm the area until mining occurs (Page "D-16"). <br />2. Ten acres are in Stage Two lobe reclaimed. <br />3. Two acres are to be reclaimed per year. thus lasting five years. <br />4. The Operator will start reclamation on the North boundary of Stage Two and <br />proceed to the South boundary of Stage Two (Page "F-1"). <br />5. A reclaimed site with a (3:1) elope will be located on the East side of Stage Two. <br />6. Stage Two will be reclaimed the method as Stage One (Page "E-4" and <br />"E-5", Paragraph "9"). <br />7. The reclamation plan stages will be marked with yellow markers along the <br />reclamation Stage Two boundaries for easier interpretation so that the <br />Contractor will have no difficulty <br />boundary. <br />staying within the reclamation Stage Two <br />8. Refer to Reclamation Stage Table (Page 'E-19J for more details and overall <br />picture. <br />9. All access roads will be reclaimed according to the reclamation plan guidelines <br />in the affected area. <br />"E-7.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.