Laserfiche WebLink
<br />MINIIVG PLAN -Exhibit "D" (Continued) <br />STAGE #13 <br />1. Access roads and crasher are progressively moved along closely behind the <br />mining operation as required. <br />2. Stage Thirteen consists of 7 acres which will be mined in increments of Z acres <br />per year, thus lasting for 3 1/2 years. <br />3. Operations will start on the West boundary of Stage 13 and proceed to the East <br />Boundary of Stage 13, as shown on map (Page "C-1"). <br />4. Sand and Gravel will be extracted in the same manner as indicated in Stage One, <br />(Pages D-2 and D-3, Paragraph 4), except that tope oil and overburden stockpiles <br />will be located in the Northeastern 1/4 of Stage 13. <br />5. No water impoundments are located at the site, and the water will be drained <br />naturally to the Southwest. The topography of the affected area will be gentle <br />three to one (3:1) slope or less, so that very little erosion will occur. <br />6. Mining plan stages will be marked with red markers along the mining stage <br />boundary so that the contractor will have no difficulty in staying inside the <br />mining stage boundary. <br />7. Refer to Mining Stage Timetable (Page'D-]b" of Mining Plan) for overall picture. <br />8. Access roads are included in the affected area. <br />"D-15.. <br />