Laserfiche WebLink
MINING PLAN -Exhibit "D" (Continued) <br />STAGE #S <br />1. Access roads and crusher are progressively moved along closely behind the <br />mining operation as required. <br />2. Stage Eight consists of 10 acres which will be mined in increments of 2 acres <br />per year, thus lasting for 5 years. <br />3. Operations will begin on the South boundary of Stage Eight and proceed to the <br />North boundary, as shown on map (Page "C-1"). <br />4. Sand and Gravel will be extracted in the same manner as indicated in Stage One, <br />(Pages D-2 and D-3, Paragraph 4), except that topsoil and overburden <br />stockpiles will be located in the Northeastern 1/4 of Stage Eight. <br />5. No water impoundments are located at the site, and the water will be drained <br />naturally to the Southeast. The topography of the affected area will be to a <br />gentle three to one (3:1) slopes or less so that very little erosion will occur. <br />6. Mining plan stages will be marked with red makers along the mining stage <br />boundary so that the contractor will have no difficulty in staying within the <br />mining stage boundary. <br />7. Refer to Mining Stage Timetable (Page"D-]6" of Mining Plan) for overall picture. <br />8. Access roads are included in the affected area. <br />"D-10" <br /> <br />