Laserfiche WebLink
<br /> <br />PDVVDEHHUHN QUARTERLY POND INSPECTION REPORT ~ <br />COAL COMPANY 4 ~~ <br />Inspector Name: ~]~~ ~toJc~= Date: 1-~-&`7 <br />Pond Number: C~7 /I Date Last Inspection: ~-30-~(~: <br />Site Name: ~oad~,cL~ F1'ly •,~ ~; ~e Pond Type: So~,vKC r+~ <br />1. Pond Depth Measured From Top Of Embankment ~~a~~ rv . ~I.'LS <br /> <br />2. Approximate Water Level Measured From Top Of Embankment ~, R ~ <br /> <br />3. Approximate Sediment Level Measured From Top Of Embankment iu.o <br /> <br />4. Discharge Through Spillway Since Last Inspection , Yes X No <br />5. Ri 11 s and Gullies Yes Il No <br />6. Vegetation Adequate x Yes No <br />7. Outlet Channel Erosion Yes ~( No <br />8. Animal Burrows Yes X No <br />9. Cracks Yes K No <br />10. Seepage Yes '~ No <br />11. Spillway Clogged Yes _< No <br />12. Valves Operational x Yes __ No <br />ADDITIONAL COMMENTS: <br />MAINTENANCE REQUIRED: <br />