Laserfiche WebLink
~~. <br />QUARTERLY POND INSPECTION REPORT <br />Pond Inspection Date: December 22,1998 <br />OPERATOR: Tensor Creek Company <br />IviINE: Terror Creek Loadout <br />POND INDENTIFICATION P-I Dugout <br />TYPE OF POND Sediment Sediment <br />STATUS DURING INSPECTION: <br />APPRO?CIMATE WATER LEVEL Dry Dry <br />SEDIMENT (% total storage) 0 % N/A <br />OUTFLOW (cfs) 0 0 <br />FEATURES <br />EROSIONAL <br />Rill & Gulleys No No <br />Inadequate Vegetation No No <br />Outlet Channel Erosion No No <br />Burrows No No <br />Other No No <br />STRUCTURAL <br />Differential Settling No No <br />Cracks or Slides No No <br />Seepage No No <br />Other No No <br />APPURTENANT STRUCTURES <br />Defective Spillways No No <br />Dewatering Devices Clogged No No <br />Faulty Gates, Etc. No No <br />Other No No <br />MAINTENANCE REQUIRED No No <br />ADDITIONAL COMMENTS: The design sediment level is 18" below the invert of the <br />primary spillway. There was a very small amount of frozen water in the sediment pond <br />during the time of inspection. <br />REFERENCE DRAWINGS: Sediment Pond - Map 7; SWMP Controls -Map 14; <br />Dugout Pond - Exh 9, page 11. <br />SWMP CONTROLS: No significant amount of coal was spilled around the loadout. The <br />hydraulic, oil;tarrk at_the loadout was sound. The sediment fences were in good repair. <br />The Blagt ~tiads;tyeie;,adequately watered. The paved haul road did not have excessive <br />°. { <br />r',-~ ZL <br />Th as~;~~Aadetsoii~.~ Date <br />Color ' A}~e$ZS~~. ' rofessional Engineer No. 14726 <br />4.., i <br />'~~ <br />XBOW MINING /NC. <br />