Laserfiche WebLink
i <br />ii <br />ir <br />i <br />i <br />iiiiii <br />ii <br />ii <br />i <br />i <br />9~ <br />QUARTERLY POND INSPECTION REPORT <br />Pond Inspection Date: September 27 30,1999 <br />OPERATOR: Tenor Creek Company <br />MINE: Terror Creek Loadout <br />POND INDENTIFICATION P-1 Dugout <br />TYPE OF POND Sediment Sediment <br />STATUS DURING INSPECTION <br />APPROXIMATE WATER LEVEL Dry Dry <br />SEDIMENT (% total storage) 0 % N/A <br />OUTFLOW (cfs) 0 0 <br />FEATURES <br />EROSIONAL <br />Rill & Gulleys No No <br />Inadequate Vegetation No No <br />Outlet Channel Erosion No No <br />Burrows No No <br />O[her No No <br />STRUCTURAL <br />Differential Settling No No <br />Cracks or Slides No No <br />Seepage No No <br />Other No No <br />APPURTENANT STRUCTURES <br />Defective Spillways No No <br />Dewatering Devices Clogged No No <br />~ <br />Faulty Gates, Etc. No No <br />Other No No <br />MAINTENANCE REQUIItED No No <br />~EcF-vEp <br />OCT 2 6 1999 <br />L `swn of M~Rerals g Gep( <br />°9Y <br />ADDITIONAL COMMENTS: The design sediment level is IS" below the invert of the <br />primary spillway. <br />REFERENCE DRAWINGS: Sediment Pond - Map 7; SWMP Controls -Map 14; <br />Dugout Pond - Exh 9, page 11. <br />S WMP CONTROLS: No significant amount of coal was spilled around the Loadout. The <br />hydraulic oil tank at the Loadout was sound. The sediment fences were in good repair. <br />The plant roads-we_re,~dequately watered. The paved haul road did not have excessive <br />amount:,ofc ~ 'llage:~ <br />0 <br />Engineer No. 14726 <br />